ORDER SAMPLES ONLINE FROM $15 DELIVERED

Travertine

Mokka Drop Face Pool Coping

Mokka Travertine Drop Face Pool Coping combines warm brown, beige and earthy tones with a honed finish.

Made in Turkey | Tumbled finish |100% Natural Stone

COLOR

mokka travertine

EDGE

Honed

FINISH

Honed

THICKNESS

SIZE

$65.00 PER PC
1 × $65.00
TOTAL PRICE
$65.00 INCL. GST

Production description

Mokka Travertine Drop Face Pool Coping combines warm brown, beige and earthy tones with a honed finish. The vertical drop profile creates a substantial border at the pool edge and a defined transition to surrounding paving. Coordinate it with Mokka tiles or French Pattern for a warm, connected outdoor design.

Travertine is valued for its layered mineral character, natural pores and gentle changes in tone. These features make every installation individual. View a sample alongside your other finishes, and blend pieces from several packs when laying to achieve a balanced distribution of colour and movement.

The drop profile adds a vertical face to the edge detail, giving the finished surface a more substantial appearance. Plan the relationship between the coping, adjoining paving and any exposed structure before ordering. Check the selected dimensions and corner requirements so the pieces work with your project layout.

Natural stone benefits from an installation and maintenance system selected for the material and intended location. Confirm substrate preparation, drainage, jointing and sealing requirements with your installer. Use a cleaner suitable for the stone, clean spills promptly and avoid unapproved acidic or abrasive products. Request a sample to assess colour and texture before ordering; samples indicate the general appearance and cannot represent every piece in a complete delivery.

Specs & Information
  • Material: Natural travertine
  • Format: Drop-face / drop-edge coping
  • Finish: Honed
  • Size options: 610 × 406 mm
  • Top thickness: 30 mm
  • Drop-face depth: 60 mm
  • Sales unit: Per piece
  • Typical use: Pool perimeters and step edges, subject to project-specific detailing
  • Natural variation: Shade, markings, texture and nominal dimensions can vary between pieces.
  • Wet-area suitability: Confirm slip suitability for the selected finish and project; no test rating is stated here.

1. Check the perimeter
Dry-lay the coping, including corners and returns. Confirm dimensions, overhang, joint positions and the relationship to adjoining paving before fixing.

2. Prepare the support
The pool builder or installer should confirm the supporting structure, waterproofing, drainage detail and movement joints for the pool or step construction.

3. Select the fixing system
Use a stone-compatible adhesive or bedding system suitable for the location. Agree any pre-sealing treatment with the adhesive and sealer suppliers first.

4. Fix with full bedding
Support the complete bearing area and edges. Set a consistent line and level, allowing the specified joints; keep movement joints flexible rather than filling them with rigid grout.

5. Protect before use
Remove residue promptly and allow the system to cure. Apply a tested, pool-suitable sealer as specified. Avoid prolonged ponding and maintain pool water within the pool supplier’s recommendations.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.